Please reach us at Sales@AzuriteDecorativeConcrete.com or call us at 502-615-7983 if you cannot find an answer to your question.
Surface temperature of your concrete should be between 50 - 90 degrees Fahrenheit.
Recommended Wait Times:
Foot Traffic - 6 hours
Furniture Placement - 24 Hours
Vehicle Traffic - 48 hours.
Most projects can be completed in two days. Day one consists of pressure washing, followed by a 16-24 hour drying period to ensure all moisture has fully evaporated. Day two includes applying two coats of sealer, with a 1-2 hour cure time between coats.
We cannot eliminate the heaving of concrete. However, once existing concrete is sealed the surface will retain less water therefore, lessen the effects of freeze / thaw cycles.
Typically 2 years before a re-coat is needed.
No. This sealer is designed exclusively for outdoor concrete surfaces. It produces strong fumes during application and curing, making it unsuitable for indoor use. To ensure proper ventilation and safe curing conditions, it should only be applied outdoors.
Yes. We need a dry weather window with no rain during both the installation and curing process. Because moisture can interfere with proper adhesion and curing, installations may need to be moved earlier or later depending on weather conditions. During rainy seasons, please expect some scheduling flexibility as we work around the forecast to ensure the best possible results.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.